Client |
Project Scope |
City |
Year |
Beirut Interational Airport
| Sandblasting and coating of 2 storage tanks 6,000m3 of Jet A-1 fuel / Installation and commissioning of a new loading station and walkways, 2 new pumping stations with control / automation and accessories.
| Beirut
| 2018
|
| Sandblasting and coating of a Jet A1 fuel storage tank (1 x 6,000 m3).
| Beirut
| 2016
|
| Rehabilitation and re-commissioning of the fire fighting system, including the replacement of 400 m 6 inch piping network (Sch. 40) and 22 valves.
| Beirut
| 2013
|
| Rehabilitation and re-commissioning of two Jet A-1 fuel storage tanks (2 x 6,000 m3), including sandblasting and internal epoxy coating of tanks.
| Beirut
| 2012
|
| Rehabilitation and re-commissioning of three Jet A-1 fuel storage tanks (3 x 6,000 m3) and 6 inch fire fighting foam system, including sandblasting and internal epoxy coating of tanks.
| Beirut
| 2006-2008
|
| Complete rehabilitation and re-commissioning of airport Jet A-1 tank farm (3 x 6 000 m3 steel storage tanks), including installation of a new 26 inch x 20 m manifold connecting 6 x 10 inch distribution pipelines (Sch. 80), new fuel pumping system (4 pumps x 200 m3/hr) for transferring product to the airport.
| Beirut
| 1998
|
| Design, engineering, installation, and commissioning of Jet A-1 fuel distribution system, including piping and filtration equipment.
| Beirut
| 1983
|
Cogico
| Rehabilitation, conversion from 95 Octane to Jet A-1 fuel and re-commissioning of two storage tanks, 7,400 m3 and 2,500 m3, to receive and deliver Jet-A1 fuel including installation of new 12 inch piping network, installation of complete filtration system, slop tank, and sampling jar apparatus.
| Jieh
| 2018
|
| Rehabilitation, modification and re-commissioning of pumping station / loading gantry.
| Jieh
| 2015
|
| Rehabilitation and re-commissioning of 5 mooring buoys, including sandblasting, coating and installation of cathodic protection.
| Jieh
| 2013
|
| Rehabilitation and re-commissioning of a 2,500 m3 fuel storage tank / sea line.
| Jieh
| 2011
|
| Rehabilitation and re-commissioning of fire fighting foam system.
| Jieh
| 2010
|
| Rehabilitation and re-commissioning of 2 fuel storage tanks (7 400 m3 et 5 500 m3).
| Jieh
| 2009
|
| Rehabilitation and re-commissioning of 2 Bitumen storage tanks (2 x 1 300 m3), including cleaning and refurbishment of boiler system.
| Jieh
| 2008
|
| Rehabilitation and re-commissioning of 2 fuel storage tanks (11 300 m3 et 7 400 m3).
| Jieh
| 2005
|
| Rehabilitation and re-commissioning of 2 fuel storage tanks (7 400 m3 et 2 500 m3) and related accessories, including sandblasting and internal / external coating.
| Jieh
| 1998
|
| Design, engineering, construction and commissioning of a 12 inch sea line 950 m (Sch. 80) and mooring system for product offloading at Jieh Oil Terminal.
| Jieh
| 1991
|
| Design, construction and commissioning of a marine terminal for fuel storage and handling at Jieh Oil Terminal, including 9 fuel storage tanks with a capacity of over 60,000 m3, piping network and fire-fighting system.
| Jieh
| 1986-1991
|
Coral Oil
| Design, engineering, construction and commissioning of a 700m sea line, 12 inch (Sch. 80) for product unloading.
| Dora, Beirut
| 1998
|
| Design, engineering, construction and commissioning of a 550m sea line, 10 inch (Sch. 80) for product unloading.
| Dora, Beirut
| 1996
|
| Design, engineering, construction and commissioning of 3 steel storage tanks for solvents (3 x 2,000 m3), including piping network and pumping and solvent processing system.
| Dora, Beirut
| 1991
|
EDL
| Refurbishment and replacement of wall cladding-steam turbine, electrical control and workshop.
| Deir Ammar
| 2002
|
| Rehabilitation and re-commissioning of 4 Westinghouse W-251 gas turbine generators.
| Zouk
| 1994
|
| Reconstruction of the exhaust system for a Westinghouse gas turbine.
| Zouk
| 1988
|
| Design, engineering, construction and commissioning of a 25,000 m3 fuel storage tank at Zouk Power Plant.
| Zouk
| 1987
|
| Design, engineering, construction and commissioning of a 150 m multi-flue chimney / Phase II of Zouk Power Plant expansion.
| Zouk
| 1987
|
| Design, engineering, construction and commissioning of a 150 m multi-flue chimney / Phase I of Zouk Power Plant construction.
| Zouk
| 1983
|
| Installation and commissioning of 2 AEG gas turbine generators.
| Zouk
| 1980
|
| Design, engineering, construction and commissioning of 2 fuel storage tanks, 2 x 10,000 m3.
| Zouk
| 1980
|
Hypco
| Modificaiton of fuel pumping station, including addition of three pumps 180 m3/hr, accessories, flanged valves, automation and installation of a new flow meter for the loading gantry.
| Antelias
| 2016
|
| Design, engineering, and installation of cathodic protection for a 750 m sea line.
| Antelias
| 2015
|
| Replacement of the bottom of a steel fuel storage tank 8 200 m3, sandblasting, coating and re-commissioning. Sandblasting and coating of 2 steel storage tanks 2,000 m3 and 4,500 m3.
| Antelias
| 2014
|
| Replacement and re-commissioning of a 420 m, 10 inch sea line (Sch. 80).
| Antelias
| 2013
|
| Rehabilitation and re-commissioning of 2 fuel storage tanks (2 000 m3 et 3 200 m3)
| Antelias
| 2011
|
| Rehabilitation and re-commissioning of 2 fuel storage tanks 6 400 m3 and 7 800 m3, including sandblasting and internal epoxy coating.
| Antelias
| 2010
|
| Rehabilitation and re-commissioning of a fire fighting system, including 6 inch (Sch. 40) piping network 250 m at MPC fuel terminal.
| Antelias
| 2008
|
| Design, engineering, construction, and commissioning of 800m sea line 10 inch (Sch. 80).
| Antelias
| 2007
|
| Design, engineering, construction, and commissioning of 8 inch (Sch. 80), 635 m submarine pipeline.
| Antelias
| 2005
|
Medco
| Rehabilitation, sandblasting, internal coating and commissioning of 2 steel fuel tanks 6 000 m3 / installation of loading gantry, including loading arm.
| Dora, Beirut
| 2016
|
| Rehabilitation and re-commissioning of 2 x 5 500 m3 steel fuel storage tanks / maintenance of 760m, 10 inch sea line and mooring buoys.
| Dora, Beirut
| 2015
|
| Rehabilitation and re-commissioning of 2 steel fuel storage tanks (7 000 m3 and 4 200 m3) / pumping stations.
| Dora, Beirut
| 2014
|
| Rehabilitation, sandblasting, patching, internal coating and re-commissioning of 2 fuel storage tanks (2 x 4 200 m3).
| Dora, Beirut
| 2013
|
| Rehabilitation, sandblasting, epoxy coating and re-commissioning of a 900 m3 water storage tank / refurbishment of fire fighting system.
| Dora, Beirut
| 2012
|
| Rehabilitation, sandblasting, internal coating and re-commissioning of 2 Bitumen storage tanks (2 x 2 000 m3), including refurbishment of boilers and piping network.
| Dora, Beirut
| 2010
|
| Rehabilitation and re-commissioning of 2 Jet A-1 fuel storage tanks (7 500 m3 and 6 000 m3), including cleaning and refurbishment of fuel filtration system.
| Dora, Beirut
| 2009
|
| Rehabilitation and re-commissioning of 3 fuel storage tanks (3 x 1 000 m3), an oil-filling and blending plant, and fire fighting system.
| Dora, Beirut
| 2008
|
| Design, engineering, construction, and commissioning of an 8 800 m3 fuel storage tank, including internal floating roof.
| Dora, Beirut
| 2007
|
| Supply, sandblasting, coating, installation, and commissioning of a new of 880 m, 8 inch (Sch. 80) sea line.
| Dora, Beirut
| 2000
|
Total
| Full reconstruction of the Total oil terminal including design, construction and commissioning of 6 fuel storage tanks with a capacity of over 50,000 m3, piping network, pumping stations, fire-fighting system, and sea lines.
| Dora, Beirut
| 1991-1995
|
Unigaz
| Design, engineering, construction and commissioning of an 800 m gas sea line 10 inch (Sch. 80).
| Dora, Beirut
| 2014
|
| Rehabilitation and re-commissioning of a 6 inch (Sch. 80) sea line for product offloading, 750 m with installation of cathodic protection.
| Dora, Beirut
| 1999
|
Wardieh
| Rehabilitation and re-commissioning of fuel storage tanks / pumping station / piping network.
| Dora, Beirut
| 2011
|
| Rehabilitation and re-commissioning of fuel storage tanks / piping network.
| Dora, Beirut
| 2010
|
ZM Group
| Rehabilitation, internal sandblasting, coating and re-commissioning of Vegetable Oil storage Tank.
| Zouk Mosbeh
| 2008
|
| Rehabilitation, internal sandblasting, coating and re-commissioning of Vegetable Oil storage Tank.
| Zouk Mosbeh
| 2007
|