Client Project Scope City Year
Total Mer Rouge Full rehabilitation and re-commissioning of fuel storage terminal with a capacity of 52,000 m3, including engineering, fabrication, and welding of new bottom plates for 4 fuel tanks; sandblasting, internal coating and re-commissioning of 10 cylindrical steel fuel tanks. Works also comprised the replacement of 32 valves of various sizes and configurations. Berbera 2000-2004
Rehabilitation and re-commissioning of 3 sea lines (3 x 600 m) 10 inch (Sch. 80). Berbera 2000-2004